“ANALISIS WAKTU DAN BIAYA PEKERJAAN PIER HEAD CAST IN SITU DAN PIER HEAD PRECAST PADA PROYEK PEMBANGUNAN TOL ANCOL TIMUR-PLUIT (ELEVATED) HARBOUR ROAD II JAKARTA UTARA” (2025) Jurnal Green Construction, 3(1), pp. 53–72. Available at: https://ojs.sttpu.ac.id/index.php/greenconstruction/article/view/73 (Accessed: 24 November 2026).